The Weed and Water Quality Management Team is making good progress on developing and implementing a comprehensive Lake Management
Plan for
Here is a detailed report of progress made as of October, 2008.
October 2008 Special Assessment District Passed
The Special Assessment District passed on October 14, 2008. We had strong resident support for this effort and also some healthy dissent. A Lake Management Plan has been completed that is designed to deliver both short term benefits on weed control and long-term benefits to improvement the health of the Lake. We have contracted with Jennifer Jones of Lakeshore Environmental to assist in the implementation of this plan and the monitoring of results throughout the five year SAD Period.
June 2008 Clean-Flo Engineered Aeration System Installed in Sherman Lake Channel
The Residents on Sherman Lake Channel worked together to install a Clean-Flo Engineered Aeration System in the Channel in June of 2008. The system operated continuously through the summer and delivered significant results in water quality improvement and weed reduction - particularly Eurasian Water Milfoil and other submerged weeds. The floating duckweed and watermeal were not eliminated, but did appear to be reduced. We are measuring and monitoring muck reduction at the bottom and should have more data next season. Early indications did indicate that biological breakdown of organics was accelerated by the Clean-Flo System.
2007 Treatment Plan
A plan has been developed for
working with Professional Lake Management in 2007 to continue to manage Eurasian Water Milfoil and attempt to reduce the Pondweed
that has become a major nuisance in the South End of the lake.
This plan was unanimously approved by the Sherman Lake Board
at the March 13, 2007 Board Meeting. To review the details of this plan click below:
2007 Water
Quality Analysis Program
A plan has been developed and a vendor has been selected to assist us in collecting and analyzing water quality
data for
This
recommendation was unanimously approved by the Sherman Lake Board at the March 13, 2007 Board Meeting. To review this recommendation
and a sample report prepared by Water Quality Investigators click below.
Recommendation (Adobe PDF version)
Recommendation (MS
Word version)
Sample Report (Adobe PDF Version)
Development and Implementation of A Resident’s Survey
A survey has been developed
to gather data on resident’s perceptions on the condition of the lake and input on the future direction of the Lake Management Plan.
This
survey is being implemented door-to-door by the Beach Directors. Results will be compiled in time for presentation and review at theAnnual Meeting on May 4, 2007.
To download a copy of the survey and the corresponding Sherman Lake Fact Sheet click below.